fan coil unit thermostat (FCU):
1)Auto changeover.
2)Auto 3speed changeover.
3)Timing set,clock.
4)IR controll,fan,valve con
Minimum Order Quantity: 1 Piece/Pieces
Supply Ability: 50000 Piece/Pieces per Month could be more
Payment Terms: L/C,T/T
Contact SupplierPackaging Detail: by carton
Delivery Detail: within 30 days since order be confirmed
Thermostat ( FCU )
Nomenclature
1)HR2010Y: Control damper to open or close.
2)HR2010DA/DA2: Control Motorized Valve (DA: Control 2-wire N.C. FCU valve; DA2: Control 3-wire FCU valve) and 3-speed fan; When the temperature reaches the set-point, it will close the Motorized Valve with the fan still running.
3)HR2010DB/DB2: Control Motorized Valve (DB: Control 2-wire N.C. FCU valve; DB2: Control 3-wire FCU valve) and 3-speed fan; When the temperature reaches the set-point, it will close the Motorized Valve and Fan both.
4)HR2010FCV2: Control 4 pipe fan coil units, Control two Motorized Valves and 3-speed fan, when the temperature reaches the set-point, it will close the Motorized Valves with the fan still running.
Founction
1)Room temperature setting
2)Manual or Auto 3-speed changeover
3) Defrost (low temperature protection)
4) Clock ( -T,-T74 )
7 days programmable ( -T74 ).
5) IR control ( -R )
6) Blue backlight ( -L )
7) Working Status: Cool, Heat, Ventilation
8) Fan Speeds: Low, Medium, High and Auto
9) Room temperature display
10) Temperature setting
11) FCU valve
12) Clock.