The oil melting oven are of two kinds of steam heating and power heating.
Price Terms:FOB,CIF,EXW
Payment Terms: T/T,Western Union,MoneyGram,L/C
Minimum Order: Negotiatable
Delivery Port: Customized
Contact SupplierPackaging Detail: PLY wooden case.
Delivery Detail: Within 35 days upon the receipt of the down payment
The oil melti oven are of two kinds of steam heating and power heating.The cupu oil and the cocoa butter substitute are melted through confined-water heating,and are put into fine grinding machine to be finely ground after having been processed into liquid.in this way,the load of the fine grinding machine may be reduced,which will prolong the fine grinding machine’s service life.
Technical specifications:
Model | RYG360(180Lx2) |
(Oil melting capacity) | 3x120=360(kg) |
(Oil melting time) | 30-60(min) |
(Heating method) | (Steam and heating) |
(Oil melting temperature) | 40-65(°C) |
(Boundary dimensions) | 1750x650x1000 |
DELIVERY DATE:
Within 35 days upon the receipt of the down payment
DELIVERY:
Ex. Our Works at Shanghai China
TERMS OF PAYMENT:
40% by T/T as the down payment, the balance shall be issued a L/C at sight confirmed by the Seller's bank, and to be paid at the presentation of the shipping documents.
OTHERS:
Testing & training:
The plant layout design, assembling and installation, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-air tickets, local transportation, board & lodging ,and US$30.-/day/person for the pocket money to our technicians. The testing people will be two persons, and will cost 30 days.
WARRANTY:
The buyer guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts or send the technicians to go to the buyer’s site for repairing and maintenance at the seller’s cost(FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
Utilities:
The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.